SERVICES

Bathroom Design

in Vienna

A bathroom does not forgive planning mistakes: water connections, ventilation and tiles are fixed in place once the tradespeople are finished. The Bathroom Design Vienna by Büro 25/12 brings technology and design together from the very start.

Natalie Vlasova

Owner, Büro 25/12

Working Format

01

Plan the bathroom on site in Vienna

Natalie Vlasova takes measurements, connections and the lighting situation on site and coordinates the planning directly with the tradespeople carrying out the work.
02

Bathroom design online

For clients outside Vienna, the planning runs online, with digital floor plans and material samples for review.

Benefits of the Bathroom Design

Plumbing planning with tradespeople

The coordination of plumbing, electrical and tiling work runs through vetted tradespeople, aligned to a shared schedule.

Modernes Badezimmer mit freistehender Badewanne

Water-resistant materials for the bathroom

Selected tiles, fittings and surfaces withstand moisture and daily use without compromising on looks.

Make the most of a small bathroom

Especially in Vienna’s period apartments, a well-thought-out layout ensures that even compact bathrooms feel functional.

Wohnzimmer mit Sofa und Pflanze

No hardware-store solutions

We work with high-quality brands rather than hardware-store products, matching the rest of the apartment’s interior design.

What Is Bathroom Design?

Bathroom Design Vienna combines the selection of tiles, fittings and furniture with the technical planning of water connections, ventilation and electrics.

Since the studio does not carry out structural work itself, licensed tradespeople handle the implementation, while design and coordination stay with the studio.

This creates a bathroom that supports the residents’ daily life and fits the rest of the apartment, rather than being planned in isolation.
Process

Phases of the Bathroom Design

01
On-site assessment
Natalie Vlasova records the floor plan, connections and lighting situation of the bathroom and clarifies initial wishes regarding style and use.
Book a consultation
02
Material and tile selection
Next, tiles, fittings and surfaces are selected and matched with the rest of the apartment’s interior design.
Book a consultation
03
Coordination of the tradespeople
Büro 25/12 coordinates the schedule and execution with the plumbing, tiling and electrical trades until the bathroom is completed.
Book a consultation
Effort & Format
The effort for a bathroom design depends on the floor area, the fittings and the condition of the existing connections. After a site visit, the studio provides a transparent estimate of the framework.
Frequently Asked Questions

Consultation & Appointment Enquiry

Discuss your bathroom project in person, by phone or via the form.